Collier Metropolitan Planning Organization
Search
------------
Plans & Programs | | Get Involved
Collage
MPO | Collier Metropolitan Planning Organization
Public Documents
---------
Who Are We
---------
About The MPO
---------
MPO 2004 Calendar
---------
Public Documents
---------
In The News
---------
Related Links
---------
Data Resources
---------
FAQs
---------
Get Involved
---------
Sign up to receive email notifications when new documents are available for review.

UNIFIED PLANNING WORK PROGRAM (UPWP)

The UPWP for the Collier Metropolitan Planning Organization(MPO) Area documents transportation planning and transportation related planning activities.  The objective of this work program is to ensure that a continuing, cooperative and comprehensive approach to planning for transportation needs is maintained and properly coordinated with other counties, other MPO's, the Southwest Florida Regional Planning Council, and the Florida Department of Transportation (FDOT).

FY2010-11 - FY2014-15 TRANSPORTATION IMPROVEMENT PLAN (TIP) Adopted June 11, 2010 with most recently approved amendments - this will take several minutes to download

The TIP is a five-year financially feasible intermodal program of transportation improvement projects. The list of projects includes highway, transit, pathways, and aviation improvements programmed in the state's multi-modal five- year work program, and may include transportation projects programmed in the local government's Capital Improvement Element.  Most federally funded projects must be listed in the TIP.  State and locally funded projects should be listed for informational purposes.  The FDOT District director coordinates the department's input into this document and insures its compatibility with the FDOT Work Program.  The TIP must be updated and adopted each year by the MPO.  

Comprehensive Pathways Plan with Addendum - Adopted on May 14, 2010  - this will take several minutes to download

The Comprehensive Pathways Plan was adopted by the MPO Board on January 12, 2006.  The Comprehensive Pathways Plan is incorporated into the currently approved Collier MPO's Long Range Transportation Plan by refernce and serves as a planning document for sidewalks, bicycle facilities, shared use pathways, and off-road trails.  On May 14, 2010, the MPO Board approved an Addendum to the Comprehensive Pathways Plan.  This addendum has incorporated The City of Naples and the City of Marco Island's Master Pathways Plans, which were adopted by their respective jurisdictions subsequent to the January 2006.

PUBLIC INVOLVEMENT PLAN (PIP)

The Public Involvement Process (PIP) manual serves as a guide for involving citizens in Collier County in the transportation  decision making process. The manual describes methods used by the MPO to educate and inform the public as well as solicit public input to the planning process. Please contact the MPO office for further information.

Adopted 2030 LONG RANGE TRANSPORTATION PLAN

The Collier MPO adopted the 2030 Long Range Transportation Plan (LRTP) for Collier County on January 12, 2006.  As part of the annual review of the LRTP and to respond to new SAFETEA-LU requirements, the Collier MPO adopted a minor update to the 2030 LRTP on June 8, 2007. The LRTP includes transportation improvements and services that are needed to serve Collier County over the next twenty-three year horizon.

CONGESTION MANAGEMENT PROCESS

The Congestion Management Process(CMP) Manual explains the development of a fully systematic process that provides information on transportation system performance and alternative strategies to alleviate congestion and enhance mobility.  The manual identifies short-term and long-term strategies to reduce congestion.

UNFUNDED PRIORITIES

The Unfunded Priorities is an annually produced list of unfunded transportation improvement projects. The adopted list of priorities is transmitted to the FDOT to be considered during their project selection process for the FDOT’s Five-Year Work Program.


Click here for a list of available document viewers

5. General (87)
Date Title/Description
01-Sep-2010 Collier MPO Invoice no 3 08-09
10-Aug-2010 Transportation Improvement Program Amendment Public Comment Period - The Collier Metropolitan Planning Organization (MPO) has opened a required 30-day public comment period for FY 2010/11– FY 2014/15 Transportation Improvement Program (TIP) Amendment to incorporate the Florida Department of Transportation’s (FDOT) Roll-Forward Report and to reconcile the changes between FDOT’s Draft Tentative Work Program and the adopted work program. The MPO Board will be asked to approve the TIP amendment with consideration of all the comments received during the public comment period. A public hearing will be held on the TIP amendment in conjunction with the MPO’s regular meeting on September 10th at the Board of County Commissioners chambers on the third floor of the Harmon Turner Building (Administration Building F) Collier County Government Center, 3301 E. Tamiami Trail, Naples. Enclosed please find a copy of the TIP amendment and a copy of the comment sheet for your review. This public comment period is from August 11 until September 10. Please fax your comments to Collier MPO Attention: MPO Principal Planner Sue Faulkner at (239) 252-5815. We appreciate your comments.
06-Aug-2010 2035 LRTP Public Workshop Information Packet July 28 2010
06-Aug-2010 Maps from 2035 LRTP Public Workshop July 28, 2010
05-Aug-2010 East of CR951 Horizon Study for Bridges 2008
24-Jun-2010 Collier Area Transit Public Workshop PowerPoint (Spanish Version)
24-Jun-2010 Collier Area Transit Public Workshop PowerPoint (English Version)
24-Jun-2010 Collier MPO 2010 Summer Newsletter
24-Jun-2010 Final Adopted 2035 Long Range Transportation Plan Public Participation Plan June 11, 2010
21-Jun-2010 FY2009-10 -- FY2013-14 Transportation Improvement Program (TIP) with most recent amendments
21-Jun-2010 Adopted 2010 Transportation Disadvantaged Service Plan (TDSP) Annual Update - The TDSP was approved by the Local Coordinating Board for the Transportation Disadvantaged of the Collier MPO on May 12, 2010 and ratified by the MPO Board on June 14, 2010.
21-Jun-2010 Draft 2010 Transit Development Plan (TDP) - Due to the size of this document, it will take several minutes to download. This is a draft document that is open for public comment from June 21st through July 20th. There are also two public workshops being held in conjunction with this public comment period. The workshops are on June 21st and June 22nd. Call the MPO at 239-252-8192 for details on the public workshops.
14-May-2010 Adopted May 14, 2010 UPWP FY 2010-11-2011-12
13-May-2010 2010 Collier County Transportation Disadvantaged Service Plan - Public comment period from May 13, 2010 until June 11, 2010
12-May-2010 Proposed Pathways Project Priorities for Boxed Funds
25-Mar-2010 Adopted Limited English Proficiency Plan
22-Mar-2010 Adopted Naples Manor Walkable Study
09-Mar-2010 Draft Addendum to the 2006 Comprehensive Pathways Plan
08-Mar-2010 Draft 2035 LRTP- Freight and Goods Movement Study
18-Feb-2010 Draft Request for Proposal 2010 Fixed Route
18-Feb-2010 Draft Request for Proposal 2010 Paratransit
17-Feb-2010 FY2008-09 - FY2009-10 Unified Planning Work Program and De-obligation
04-Jan-2010 2009 Transit Development Plan Final - Approved Sept 2009
18-Dec-2009 MPO 2010 Meeting Calendar
13-Nov-2009 Florida Fish and Wildlife Panther Conservation Challenges Presentation by Darell Land
06-Nov-2009 November 13, 2009 MPO Agenda Packet
23-Oct-2009 2035 Long Range Transportation Plan Newsletter
16-Oct-2009 Final Collier MPO 2035 Long Range Transportation Plan Public Involvement Plan
12-Oct-2009 Adopted Collier County Bus Shelter Need Study
21-Sep-2009 LCB Bylaws
16-Sep-2009 Approved 2009 Transportation Disadvantaged Service Plan Minor Update
05-Aug-2009 City of Marco Island Linear Park Trail Phase 2 Project
05-Aug-2009 City of Naples Gulfshore Blvd North Sidewalk
05-Aug-2009 City of Naples Mooring Line Drive Sidewalk
05-Aug-2009 City of Naples Second Street South Sidewalk
05-Aug-2009 City of Naples Third Street Sidewalk
05-Aug-2009 Golden Gate MSTU Coronado and Hunter Grant
05-Aug-2009 Immokalee MSTU Grant Application
05-Aug-2009 Radio Rd East Santa Barbara Blvd - Grant
05-Aug-2009 Radio Road MSTU Livingston to Airport
05-Aug-2009 ATM Bus Stop Improvement Project
30-Jun-2009 Adopted June 12, 2009 Transportation Improvement Program
26-Jun-2009 Adopted 2008/09-09/10 Unified Planning Work Program- Amended on June 12, 2009
27-May-2009 Draft Transportation Disadvantaged Service Plan (TDSP)
13-May-2009 DraftTransportation Improvement Program (TIP) Public Comment Period
13-May-2009 2008-09-2009-10 Unified Planning Work Program Amendment Public Comment Period
13-May-2009 Adopted 2008-09-2009-10 Unified Planning Work Program (UPWP)
07-May-2009 Collier County Adopted Transit Development Plan Minor Update
28-Apr-2009 Draft Transportation Improvement Program (TIP)
16-Apr-2009 2008/09-2009/10 Draft Unified Planning Work Program Amendment
31-Mar-2009 MPO Spring 2009 Newsletter
10-Mar-2009 Transportation Investment for Green, Efficient Roadways
19-Feb-2009 Unified Planning Work Program Revision
07-Jan-2009 Draft Program Management Plan (PMP)
07-Jan-2009 Transportation Disadvantaged Service Plan (TDSP) Amendment
05-Jan-2009 Adopted 2008 Congestion Management Process (CMP)
05-Jan-2009 MPO Committee Advisory Application
05-Jan-2009 MPO BY-Laws
05-Jan-2009 TAC BY-LAWS
16-Dec-2008 Amended 2008/09-2009/10 Unified Planning Work Program (may take several minutes to download)
15-Dec-2008 Adopted 2009 MPO Meeting Schedule
09-Dec-2008 CMS-ITS Bylaws
22-Oct-2008 LCB Bylaws
25-Jun-2008 Approved Final Freight and Goods Mobility Analysis Report (may take several minutes to download)
16-Jun-2008 Final 2008 Public Involvement Plan
12-Jun-2008 MPO Staff Certification Powerpoint June 12, 2008 (may take several minutes to download)
30-May-2008 Amended 2007 Transportation Improvement Program (may take several minutes to download)
19-May-2008 S.S. Jolley Bridge: Toll Feasibility Study Draft Final Report (may take several minutes to download)
16-May-2008 Adopted FY 2008/09-2009/10 UPWP (may take several minutes to download)
16-May-2008 PAC Bylaws
12-May-2008 Draft 2008-2009-2012-2013 TIP (may take several minutes to download)
09-Apr-2008 Draft Freight and Goods Mobility Analysis Report
28-Mar-2008 CAC Bylaws
06-Mar-2008 Collier MPO Disadvantaged Business Enterprise Program Policy
05-Mar-2008 Draft 08/09 Unified Planning Work Program
05-Oct-2007 2007 Adopted Transportation Disadvantaged Service Plan (may take several minutes to download) - This is the 2007 Transportation Disadvantaged Service Plan (TDSP) approved by the Local Coordinating Board (LCB) on August 8, 2007 and ratified by the MPO Board on September 14, 2007.
28-Aug-2007 Collier TDP Annual Progress Report 2007 (May take several minutes to download)
02-Jul-2007 Adopted 07/08-11/12 Transportation Improvement Program (TIP) (may take several minutes to download)
30-Jun-2007 2007 Update of the 2030 Long Range Transportation Plan - Full LRTP documentation Adopted June 8, 2007 with updates.
30-Jun-2007 Executive Summary of 2007 Minor Update of the 2030 LRTP - Executive Summary provides documentation of issues addressed in the 2007 Minor Update of the LRTP.
30-Jun-2007 Adopted 2007/2008 Unified Planning Work Program - Adopted FY 2007/2008 Unified Planning Work Program.
26-Apr-2007 Comprehensive Pathways Plan (takes several minutes to download)
02-Mar-2006 Adopted 2030 Financially Feasible Plan
02-Mar-2006 Adopted 2030 Needs Plan
06-Feb-2006 Adopted 2030 LRTP Executive Summary
03-Feb-2006 Adopted 2030 Long Range Transportation Plan (May take several minutes to download) - This is the original 2030 LRTP document adopted on January 12, 2006. It is now superceded by the 2007 update adopted on June 8, 2007.
07-Dec-2005 Park and Ride Site Identification Study

© Copyright 2010. Collier MPO Main. All Rights Reserved. A solution by INgage Networks.
Member login

------------

Contact Us  | Disclaimer  | Privacy Statement