 |
Date |
Title/Description |
 |
22-Mar-2010 |
2000 TAZ Boundaries for 2030 LRTP - This is the 2000 TAZ boundaries files for Collier County 2030 Long Range Transportation Plan |
 |
22-Mar-2010 |
2007 Base Year TAZ data for 2035 LRTP - This is the base year TAZ data including boundaries and Zdata info for Lee-Collier regional model |
 |
20-Aug-2007 |
Existing Plus Committed Network with 2030 Land Use - Existing Plus Committed Network includes existing facilities, those under construction and those funded through construction in the existing and following two fiscal years (FY 2007, 2008 and 2009). Land use is year 2030. |
 |
20-Aug-2007 |
Existing Plus Committed with 2010 Land Use - Existing Plus Committed Network includes existing facilities, those under construction and those funded through construction in the existing and following two fiscal years (FY 2007, 2008 and 2009). Land use is year 2010. |
 |
20-Aug-2007 |
2030 Financially Feasible Plan Model - 2030 Financially Feasible Plan Model include both cost feasible components of Collier and Lee MPO LRTPs. |
 |
20-Aug-2007 |
Adopted 2015 Model - 2015 Model includes the short range planned projects of the 2030 cost feasible plan. |
 |
20-Aug-2007 |
2030 Needs Plan Model - 2030 Needs Plan model files including loaded network shape files. |
 |
30-Jun-2007 |
Year 2000 Validation Model - Validation Year 2000 Model files |
 |
30-Jun-2007 |
Programs Folder - The Programs Folder contains the files necessary to run the airport trip distribution module specific to the Collier Lee models. Since the distribution is based on population distribution it is necessary to have this module running. See read Directory Setup for the proper folder setup to run the module. |
 |
27-Jun-2006 |
ZDATA - Interim Year zonal data |
 |
22-Jun-2006 |
Directory Setup - Please read this document before running the model |