Collier Metropolitan Planning Organization
Search
------------
Plans & Programs | | Get Involved
Collage
MPO | Collier Metropolitan Planning Organization
Data Resources
---------
Who Are We
---------
About The MPO
---------
MPO 2004 Calendar
---------
Public Documents
---------
In The News
---------
Related Links
---------
Data Resources
---------
FAQs
---------
Get Involved
---------
Click here for a list of available document viewers

FLORIDA STANDARD URBAN TRANSPORTATION MODEL (FSUTMS) FILES (10)
Date Title/Description
20-Aug-2007 Existing Plus Committed Network with 2030 Land Use - Existing Plus Committed Network includes existing facilities, those under construction and those funded through construction in the existing and following two fiscal years (FY 2007, 2008 and 2009). Land use is year 2030.
20-Aug-2007 Existing Plus Committed with 2010 Land Use - Existing Plus Committed Network includes existing facilities, those under construction and those funded through construction in the existing and following two fiscal years (FY 2007, 2008 and 2009). Land use is year 2010.
20-Aug-2007 2030 Financially Feasible Plan Model - 2030 Financially Feasible Plan Model include both cost feasible components of Collier and Lee MPO LRTPs.
20-Aug-2007 Adopted 2015 Model - 2015 Model includes the short range planned projects of the 2030 cost feasible plan.
20-Aug-2007 2030 Needs Plan Model - 2030 Needs Plan model files including loaded network shape files.
20-Aug-2007 TAZ Boundaries - 2000 Base Traffic Analysis Zone (TAZ) Boundaries. Also includes Collier and Lee Roadway files.
30-Jun-2007 Year 2000 Validation Model - Validation Year 2000 Model files
30-Jun-2007 Programs Folder - The Programs Folder contains the files necessary to run the airport trip distribution module specific to the Collier Lee models. Since the distribution is based on population distribution it is necessary to have this module running. See read Directory Setup for the proper folder setup to run the module.
27-Jun-2006 ZDATA - Interim Year zonal data
22-Jun-2006 Directory Setup - Please read this document before running the model
CONGESTION LEVELS & CONSTRUCTION START YEAR (3)
Date Title/Description
20-Apr-2006 Collier County Five Year Work Program
17-Nov-2004 1998 Collier County Traffic Congestion Levels & Construction Start Year
17-Nov-2004 1999 Collier County Traffic Congestion Levels & Construction Start Year
CURRENT EXISTING ROAD NETWORK (2)
Date Title/Description
17-Nov-2004 Collier County Functional Class Map
18-Nov-2004 Bonita Springs/Naples Urbanized Area Functional Class Map - Coming Soon
LONG RANGE PLAN (11)
Date Title/Description
30-Aug-2007 2030 Financially Feasible Network - This document provides the number of lanes in the 2030 FFP highway network as approved by the MPO in June 2007.
30-Aug-2007 2030 Financially Feasible Plan Volume-to-Capacity - This graphic provides the volume-to-capacity ratios for the 2030 FFP highway network adopted in June 2007.
30-Aug-2007 2030 Needs Network - This graphic represents the number of lanes in the 2030 Need Plan Highway Network as adopted by the MPO June 2007.
30-Aug-2007 2030 Needs Plan Volume-to-Capacity - This graphic provides the volume-to-capacity ratios for the 2030 Needs Plan highway network adopted in June 2007.
30-Aug-2007 2015 Plan Network - This graphic represents the number of lanes in the 2015 Highway Network as adopted by the MPO June 2007.
30-Aug-2007 2015 Highway Network Volume-to-Capacity - This graphic provides the volume-to-capacity ratios for the 2015 highway network adopted in June 2007.
30-Aug-2007 Existing Plus Committed Network (2010) - This graphic represents the number of lanes in the Existing Plus Committed Network including projects committed through construction by 2010 as adopted by the MPO June 2007.
30-Aug-2007 Existing Plus Committed Network Volume-to-Capacity - This graphic provides the volume-to-capacity ratios for the Existing Plus Committed highway network adopted in June 2007.
17-Nov-2004 2025 Long Range Transportation Plan Needs Plan - This document has been updated as the 2030 Needs Plan. The 2025 Needs Plan remains for informational purposes.
17-Nov-2004 2025 Long Range Transportation Plan Financially Feasible Plan - This documented has been updated in the 2030 LRTP minor update adopted June 2007. This document remains for informational purposes.
17-Nov-2004 2025 Level of Service (LOS) Network - This document is replaced by that adopted by the Collier MPO in the 2030 LRTP, minor update June 2007. This document remains for informational purposes.
Regional Network Maps (1)
Date Title/Description
29-Sep-2006 Joint Lee/Collier Regional Network Map
COMMUNITY OUTREACH TOOLS (1)
Date Title/Description
07-Feb-2007 Community Outreach Tools - Interactive Socio-cultural information can be used to generate mailing labels based on location or community interest. This tool also allows the user to select a community of interest and the application will create a community characteristics report summarizing population, demographics, income, and household information in the community.

© Copyright 2008. Collier MPO Main. All Rights Reserved. A solution by Neighborhood America.
Member login

------------

Contact Us  | Disclaimer  | Privacy Statement